Contractor Markup & Margin Calculator: Price a Job for Profit
Price a job so it actually makes money. Enter materials, labour, subcontractors and equipment, add your overhead and pick a profit margin. You get the price to quote, the profit and the markup that gets you there.
Prefer a spreadsheet? Download this calculator free for Excel (it opens in Google Sheets too).
How it works
- Direct job cost = materials + labour + subcontractors + equipment.
- Overhead covers what the business spends that is not tied to one job: insurance, vehicles, tools, phone, office and your own admin time.
- Price = total job cost / (1 - target margin). Profit = price - total job cost.
- Markup is profit as a share of cost; margin is profit as a share of the price. A 25% margin needs a 33.3% markup, which is why marking up by 25% only gives a 20% margin.
Want this worked out for you every month?
The Contractor Job Costing Spreadsheet builds printable estimates and invoices, tracks real costs against each job, and shows the profit, margin and unpaid balance on every job. It works in Excel and Google Sheets, in any currency, with no subscription.
See the Contractor Job Costing Spreadsheet Go straight to Etsy
Questions people ask
What is the difference between markup and margin?
Markup is added on top of cost; margin is the share of the price that is profit. Margin = markup / (1 + markup), so a 50% markup is a 33.3% margin.
What overhead percentage should I use?
Add up a year of business costs that are not job materials or labour and divide by a year of job costs. Many small contractors land somewhere between 10% and 20%.
What profit margin should a contractor aim for?
It varies by trade and market, but pricing for a clear profit on top of overhead is what keeps a business going through slow months and callbacks.